Briar Chapel Community Wastewater Treatment Facility
Owner:
Briar Chapel Utilities, LLC
Category:
Subdivision
Engineer:
W. Lee Fleming, Jr. Engineering
601 Oberlin Road Suite 200
Raleigh, North Carolina
919-833-1234
Design:
.250 MGD McNeill "QUAD" wastewater treatment system designed to be expanded to .75 MGD with reclaimed water reuse system.
Project Description:
250,000 GPD expandable to 750,000 GPD McNeill "QUAD" wastewater treatment plant with a 3,750,000 gallon lined reject pond, a 39,000,000 gallon lined storage pond and a 44.5 acre irrigation system for this upscale development by Newland communities, San Diego.