View the Project Profiles listed to the right for a closer look at the scope of projects that McNeill Water and Wastewater, Inc., has had the opportunity to work on. You will find a wide range of facilities in terms of size, design and application, demonstrating the vast experience and expertise of McNeill Water and Wastewater, Inc.

For information on how McNeill Water and Wastewater, Inc., can help solve your specific water or wastewater issues call (800) 634-6543 or send us an email.



Alligator Bay Community Wastewater Treatment Facility

Owner:
Alligator Bay Development, LLC

Category:
Subdivision

Original Plant Engineer:
W. Lee Fleming, JR. engineering
601 Oberlin Road, Suite 200
Raleigh, North Carolina
919-833-1234

Expansion Engineer:
Clark Roumelis & Associates
1933 Commonwealth Lane
Tallahassee, FL

Design:
.120 MGD McNeill "Quad" wastewater treatment system and reclaimed water utilization system.

Project Description:
120,000 GPD expandable dual path McNeill wastewater treatment reuse system with a 1,760,000 gallon lined wet weather storage pond, a 600,000 gallon lined reject pond and a 11.9 acre irrigation area consisting of 10 irrigation zones to serve 970 bedrooms on 277 residential lots.


Town of Branford Wastewater Treatment Facility

Owner:
Town of Branford
P O Box 577
Branford, FL 32008-0577

Category:
Municipality

Original Plant Engineer:
Mr. Alan Aront, P.E.
Sverdrup & Parcel & Associates, Inc.
Gainesville, FL

Expansion Engineer:
Clark Roumelis & Associates
1933 Commonwealth Lane
Tallahassee, FL

Original Plant Design:
0.075 MGD extended aeration or 0.150 MGD contact stabilization McNeill "QUAD" wastewater treatment facility. This expansion of the existing McNeill "QUAD" 0.114 MGD extended aeration was completed some 20 years after the first construction.

Comments:
In a competitive bid situation for the original construction, the McNeill plant, although not the lowest price, was recommended by Mr. Alan Aront, P.E., the project engineer. His decision was based on projected long range savings in electricity, chemicals, maintenance upkeep costs and maintenance labor the McNeill plant would provide.

The expansion was bid with the McNeill equipment and technical support package price written into the bid documents for all bidders to use.


Briar Chapel Community Wastewater Treatment Facility

Owner 
Briar Chapel Utilities, LLC

Category
Subdivision

Engineer:
W. Lee Fleming, Jr. Engineering
601 Oberlin Road Suite 200
Raleigh, North Carolina
919-833-1234

Design:
.250 MGD McNeill "QUAD" wastewater treatment system designed to be expanded to .75 MGD with reclaimed water reuse system.

Project Description:
250,000 GPD expandable to 750,000 GPD McNeill "QUAD" wastewater treatment plant with a 3,750,000 gallon lined reject pond, a 39,000,000 gallon lined storage pond and a 44.5 acre irrigation system for this upscale development by Newland communities, San Diego.


Town of Castleberry Modular Precast Concrete Wastewater Treatment Facility

Owner:
Town of Castleberry
P O Box 97, Castleberry, AL 36432
334-966-2141

Category:
Municipality

Engineer:
Hogg Engineering Corporation
1 Satterfield Street, Selma, AL 36701

Contact:
Mr. Ray Hogg, P.E.

Design:
0.006 MGD McNeill extended aeration modular plant with flow equalization, table chlorination and De-chlorination

Project Location:
The wastewater treatment plant is located 1 to 2 miles north of Castleberry on U.S. 31. It is in the vicinity of the Trus Joist McMillian factory on the east (right) side of the road.

Effluent Disposal
Stream discharge

Comments
McNeill Water and Wastewater, Inc., was the named wastewater treatment plant manufacturer in the Bid Documents. McNeill technical staff worked with the project engineer to provide plans and specifications for the plant.


Chapel Ridge Community Wastewater Treatment Facility

Owner:
Heater Utilities, Inc.

Category:
Subdivision

Engineer:
W. Lee Fleming, Jr. Engineering
601 Oberlin Road
Suite 200
Raleigh, North Carolina
919-833-1234

Design:
.5 MGD McNeill “QUAD” wastewater treatment system and water reclaimed utilization system.

Project Description:
500,000 GPD expandable McNeill "QUAD" wastewater treatment plant, a 2,860,825 gallon reject pond, a 42,839,747 gallon irrigation water storage pond with spray irrigation on 218 acres on common area and golf course.


Claiborne County Utility District Wastewater Treatment Facility

Owner:
Claiborne County Utility District

Category:
Municipality

Original Plant Engineer:
.65 MGD McNeill patented "HEXA-DITCH" Wastewater Treatment Facility

Project Description:
Constructed as a 650,000 GPD addition to the utility districts existing treatment facility. The McNeill patented "HEXA-DITCH" common wall design was used to save the district 30% to 40% in initial construction cost of the concrete structures, 75% to 90% on process piping and the plant is operating with some 70% savings in energy cost.

The common wall construction of the patented "HEXA-DITCH" also means an easier and more cost efficient expansion when needed.


Florida Department of Corrections Taylor County Wastewater Treatment Facility

Owner:
FL D.O.C
Taylor County Correctional
P O BOX 1086, Perry, FL 32346

Category:
Prison

Original Plant Design:
0.200 MGD extended aeration McNeill Quad

Engineer:
Connelly and Wicker, Inc.
P O BOX 51343, Jacksonville Beach, FL 32240-1343
David Avery, P.E.
904-249-7995

Expansion Design:
0.400 MGD extended aeration McNeill Quad

Comments:
McNeill Water and Wastewater, Inc., was the named pre-approved manufacturer in the Bid Documents for both the original construction and the expansion. The technical department of McNeill worked close with the Project Engineer on both phases to provide design drawings and specifications for use in the permit and bid process.


Town of Franklinville Wastewater Treatment Facility

Owner:
Town of Franklinville
P.O. Box 277
Franklinville, Randolph County, NC 27248
336-824-2604 City Hall
336-824-6440 Mr. Arnold Allred, PWD

Category:
Municipal

Engineer:
Hobbs, Upchurch and Associates
290 SW Broad St., Southern Pines, NC 28387
Mr. Roger Green, P.E. 910-692-5616

Design:
0.200 MGD McNeill extended aeration Quad, with built-in flow equalization 144 sq ft tertiary filtration, UV disinfection

Effluent Disposal:
Stream discharge

Comments:
McNeill Water and Wastewaters, Inc., was the named pre-approved manufacturer in the bid documents. The technical department of McNeill provided the project engineer with design drawings and specifications for use in the permit and bid process.


Hasentree Golf Community Wastewater Treatment Facility

Owner:
Lowery Services, LLC

Category:
Subdivision

Engineer:
W. Lee Fleming, Jr. Engineering
601 Oberlin Road, Suite 200
Raleigh, North Carolina
919-833-1234

Design:
.2 MGD McNeill "Quad" Reuse Plant, tertiary filtration, U.V. with chlorine disinfection.

Project Description:
200,000 GPD expandable dual path wastewater treatment reuse system with a reclaimed water storage and irrigation system, which consists of a 21,800,000 gallon lined storage pond, a 1,000,000 gallon reject pond, 154 acres for reclaimed water irrigation area comprised of an 18 hole golf course and driving range to serve 1512 bedrooms on 432 residential lots.


The Legacy at Jordan Lake Community Wastewater Treatment Facility

Owner: 
Heater Utilities, Inc.

Category: 
Subdivision

Engineer: 
W. Lee Fleming, Jr. Engineering
601 Oberlin Road   Suite 200
Raleigh, North Carolina
919-833-1234

Design: 
.120 MGD McNeill “QUAD” wastewater treatment system and reclaimed water irrigation system.

Project Description: 
120,000 GPD expandable dual path McNeill wastewater treatment reuse system with a 16,900,000 gallon storage pond, a 890,000 gallon reject pond and a 130.8 acre irrigation area consisting of 34 zones to serve 999 bedrooms.


Lake Merial Community Wastewater Treatment Facility

Owner: 
Lake Merial, Inc.

Category: 
Subdivision

Engineer: 
Panhandle Engineering, Inc.
Jim Slonina, P.E.
Lynn Haven, Florida
850-763-5200

Design: 
Phase I constructed as a 98,000 GPD expandable McNeill "MODULAR" precast concrete wastewater treatment system with effluent disposed of utilizing rapid infiltration beds. The plant is designed and equipped for denitrification using MLE process.

Project Description: 
98,000 GPD first phase McNeill “MODULAR” precast concrete wastewater treatment plant.  Effluent disposal with rapid infiltration basins fully constructed for ultimate flow of 300,000 GPD.


Madison Lake Wastewater Treatment Facility

Owner:
Madison Lakes, LLC

Category:
Subdivision 1,096 Acre Development

Design:
Phase I constructed as a 50,000 GPD extended aeration plant, with Ozone disinfection.

Project Description: 
Phase I constructed as a 100,000 GPD contact stabilization plant equipped to operate initially as a 50,000 GPD extended aeration plant.

Phase II is planned as a McNeill "QUAD" poured in place concrete plant utilizing all tanks constructed and installed in Phase I for sludge holding. Effluent is land applied.


Otter Creek Wastewater Treatment Facility

Owner:
Wakulla County Board of Commissioners
Crawfordville, FL

Category:
Municipality- Design Build Project

Engineer:
Jones Edmunds & Associates, Inc.
1100 Cesery Blvd

Design:
0.495 MGD McNeill extended aeration Quad plant with provision to expand to ultimate flow of 1.6 MGD.

Effluent Disposal:
Dedicated sprayfield


Pearl River Community Wastewater Treatment Facility

Owner:
Mississippi Band of Choctaw Indians
100 Utility Circle,
Philadelphia, Ms 39350

Category:
Indian Reservation - hotels, casinos,
light manufacturing facilities

Engineer:
Jim Meridith, P.E.
4056 Brandywine Pointe Blvd
Old Hickory, Tn 37138

Expansion Design:
0.400 MGD extended aeration McNeill Quad

Comments:
McNeill Water and Wastewater, Inc., was the named pre-approved manufacturer in the Bid Documents for both the original construction and the expansion. The technical department of McNeill worked close with the Project Engineer on both phases to provide design drawings and specifications for use in the permit and bid process.


Point Washington (Seagrove Beach) Wastewater Treatment Facility

Owner:
Florida Community Service Corporation
70 Logan Lane
Santa Rosa Beach, FL 32245

Category:
Utility - Design-Build Project

Design:
0.750 MGD McNeill extended aeration Quad,
256 sq. ft filters, influent screening, surge/anoxic reactor, and effluent pump station

Comments :
This project was a Design-Build project providing the utility with a turnkey package which included engineering services from design, permitting, through construction inspections, site work, and manufacture of the wastewater treatment plant and filters, general construction and bonding.

Riverdell Community Wastewater Treatment Facility

Owner:
Heater Utilities, Inc.
202 MacKenan Court, Cary, NC 27511

Category:
Subdivision

Engineer:
W. Lee Fleming, P.E., Jr. Engineering
601 Oberlin Road, Suite 200
Raleigh, NC 27605

Design:
0.250 MGD expandable to 0.750 MGD McNeill extended aeration Quad
180 sq ft tertiary filter, UV disinfection, nitrogen removal system.

Effluent Disposal:
Stream discharge - Neuse River

Comments:
McNeill Water & Wastewater, Inc., provided a unique wetwell valvebox to the owners of Riverdell. This design by W. B. McNeill, Jr. is a quality controlled factory built unit that provides substantial savings in field installation costs to the owner. Later that year the engineer contacted McNeill Water & Wastewater, Inc., about plans to provide a wastewater treatment plant to serve a subdivision.

The plant selected would have to meet or exceed the stringent effluent requirements of the State of North Carolina's Division of Water Quality Control. McNeill worked with the engineer through the design/permitting and construction phase.


Spruce Creek South Community Wastewater Treatment Facility

Owner:
Marion County Utilities

Category:
Municipal

Engineer:
Farner Barley & Associates, Inc.
350 N. Sinclair Avenue, Tavares, FL 32778
352-343-8481

Effluent Disposal:
Golf Course Irrigation

Comments:
McNeill designed this plant to work in conjunction with an existing wastewater facility and to meet strict effluent requirements. A fast track project, McNeill accomplished substantial completion within the 120 days allowed by contract.


Town of Greenville Wastewater Treatment Facility

Owner:
Madison County & Town of Greenville
C/O Town of Greenville
P O BOX 235, Greenville, FL 32331
904-948-2251

Operator:
Ken Knight
352-339-0629

Category:
Municipal

Engineers:
David Melvin Consulting Engineers
345 South Magnolia, Suite D-B
Tallahassee, FL 32301
David Melvin, P.E.
850-671-7221

Clark Roumelis and Associates
1933 Commonwealth Lane
Tallahassee, Fl
850-574-1574

Armentrout and Marbury, Inc.
2121 Corporate Square, Suite 210
Jacksonville, FL 32216
Mr. Bill Armentrout, P.E.
904-727-7030

Comments:
Through competitive bidding the original construction and first two expansions McNeill Water and Wastewater, Inc., was awarded the wastewater treatment plant work.

When it was time to expand for the third and fourth times, McNeill Water and Wastewater, Inc., was specific as the wastewater treatment plant manufacturer. The McNeill specification and selling price were shown in the actual bid documents for use by all general contractors bidding the project.


Town of Maplesville Modular Precast Concrete Wastewater Treatment Facility

Owner:
Town of Maplesville
Water Works & Gas Board
P O BOX 9, Maplesville, AL 36750
334-249-4705

Category:
Municipal

Engineer:
Larry E. Speaks and Associates
544 Martha Street
Montgomery, AL 36104
334-262-1091
Contact: Mr. Larry Speaks, P.E.

Design:
0.075 MGD McNeill extended aeration modular plant with flow equalization, post aeration, UV disinfection

Effluent Disposal:
Stream discharge

Comments:
McNeill Water & Wastewater, Inc., was the named wastewater treatment plant manufacturer in the Bid Documents. McNeill's technical staff worked with the project engineer to provide plans and specifications for the plant.


Town of Sycamore Modular Precast Concrete Wastewater Treatment Facility

Owner:
Town of Sycamore
Sycamore Water & Fire Authority
P O BOX 310, Sycamore, AL 35149
334-249-4705

Category:
Municipal

Engineer:
Ladd Environmental Consultants
1217 Chitwood Ave., S.E.
Ft.Payne, AL 35173
334-845-5315
Contact: Mr. Larry Whitley, P.E.

Design:
A 0.024 MGD McNeill extended aeration modular plant with flow equalization, tablet chlorination and ce-chlorination.

Effluent Disposal:
Stream Discharge

Comments:
McNeill Water & Wastewater, Inc., was the named wastewater treatment plant manufacturer in the bid documents. McMeill's technical staff worked with the project engineer to provide plans and specifications for the plant. This plant was expanded to 40,000 G.P.D. which is its current capacity.


Waterfall Country Club Community Wastewater Treatment Facility

Owner: 
Lake Burton Development, LLC

Category: 
Subdivision

Engineer: 
Rindt-McDuff Associates, Inc.
334 Cherokee Street
Marietta, Georgia 30060
770-427-8123

Design: 
A 75,000 GPD wastewater treatment plant and water reuse system (top).  McNeill “MODULAR” precast concrete plant with associated poured-in-place concrete reject and water storage tanks. A 75,000 GPD potable water plant was also constructed by McNeill under the same contract.

Project Description: 
Wastewater reuse system irrigated on golf course at this upscale country club community.


Winco Wastewater Treatment Facility

Owner:
Winco Utilities
569 S. Edgewood Avenue
Jacksonville, Fl 32204
Mr. Sandy McArthur
904-388-3561

Category:
State Correctional Facility/Industrial Park

Engineer:
Preble-Rish, Inc.
3841-C Killearn Court, Tallahassee, Fl, 32308
Mr. Greg S. Preble, P.E.
850-668-4481

Design:
0.750 MGD McNeill Concrete poured in place patented "Hexa-Ditch" wastewater treatment plant, headworks with static screen, gas chlorination disinfection. Current permit is for 0.495 MGD

Location:
Woodville, Leon County, Florida

Comments:
Working with the project engineer, McNeill Water & Wastewater, Inc., designed this plant to meet the stringent influent characteristics anticipated from the Correctional Facility and the Industrial Park.

Due to unstable soil conditions McNeill provided a slurry pile system to stabilize the wastewater treatment plant slab structure.


Windemere Wastewater Treatment Facility

Owner:
Newland Communities
c/o Terrabrook , 6120 Windward Parkway
Alpharetta, GA 30005

Category:
Subdivision w/Golf Course

Engineer:
Mr. Nolan L. Johnson, Jr., P.E.
Civil Engineering Consultants, Inc.
Suite 855 1225 Johnson Ferry Road
Marietta, Ga 30068

Design:
0.250 MGD extended aeration McNeill "Quad" facility including a rotary drum screen, 2 stage activated sludge reactors, filters, and U.V. disinfection.

Effluent Disposal:
Re-use discharge, Golf Course Irrigation.

Comments:
The Windermere facility features state of the art technology and design processes to provide a quality effluent that will be used in public access areas at build out. One example is control of turbidity. Before the treated wastewater goes into the irrigation system the turbidity is read by a turbidity meter. This meter will reject the flow if it does not meet a predetermined criteria and direct it to a reject pond.

Once the turbidity reading is satisfactory, an automatic valve will allow the water back into the system. Another unique feature is an electric control panel regulated by computer. It can be read and allow changes in the plant operation from an off site computer located at the McNeill Technical Department over two hundred miles away.


McNeill Projects Under Construction

Booth Mountain Wastewater Treatment System

A dual path 90,000 GPD McNeill Modular pre-cast wastewater treatment facility in Chatham County, North Carolina.

Caroline Meadows Wastewater Treatment System

A 375,000 GPD McNeill Quad Wastewater Treatment Plant, located in Chatham County, North Carolina.

Mission Inn Golf and Tennis Resort Wastewater Treatment System

870,000 GPD McNeill Quad Wastewater Treatment Plant, located in Howey-in-the-Hills, Florida.

Currahee Club Wastewater Treatment System

100,000 GPD McNeill Modular Pre-cast Concrete Wastewater Treatment Plant in Toccoa, Georgia.