Currahee Club Wastewater Treatment System
A 100,000 GPD McNeill Modular Pre-cast Concrete Wastewater Treatment Plant with phase one permitted and operated as a 50,000 GPD system. Effluent in phase one to be disposed of using a drip irrigation system. Project includes a 750,000 gallon covered effluent holding tank. Future phases include the construction of a 400,000 GPD McNeill Quad wastewater treatment plant with phase one tankage used for sludge holding.

Updated October 8, 2007

Top view of the steel framework for the effluent holding tank at the Currahee Club Wastewater Treatment System project Side view of the steel framework for the effluent holding tank at the Currahee Club Wastewater Treatment System project Steel framework starts to go up for the effluent holding tank
Steel framework starts to go up for the effluent holding tank Metal forms going in for the 750,000 gallon covered effluent holding tank at the Currahee Club Wastewater Treatment System Concrete pouring underway for the 750,000 gallon covered effluent holding tank at Currahee Club
construction at the Currahee Club Wastewater Treatment System construction at the Currahee Club Wastewater Treatment System Earth being removed during construction at Currahee Club
A pre-cast concrete hopped is lowered into place at the Currahee Club Wastewater Treatment System Precast concrete hoppers lined up during construction at the Currahee Club Wastewater Treatment System Precast concrete hoppers lined up during construction at the Currahee Club Wastewater Treatment System
Excavation holes are prepared for precast concrete hoppers during the first phase of construction at the Currahee Club Wastewater Treatment System    

 